About · Ottawa, Ontario
An Ottawa crew that starts below grade
Korvex Developments builds fences, decks, interlock, drainage and grading, retaining walls, masonry and steps, and backyard renovations for Ottawa homeowners, and renovates bathrooms, basements and walls, and fireplaces indoors. Every job on this site is our own, photographed on site as it was built.

- Company
Korvex Developments Inc. · Ottawa, Ontario
- Your job
One project lead from the estimate to the final walkthrough
- Reviews
18 on Google, HomeStars and Facebook · Google 5.0. Read them
- Service area
Ottawa & surrounding areas. See the areas we cover
- What we build
FencesDecksInterlockDrainage & GradingRetaining WallsMasonry & StepsBackyard RenovationsBathroomsBasements & WallsFireplaces
- Estimates
Free and on site. Request one or call 613-880-7679.
Who you deal with
One project lead and the crew
One project lead takes your job from the site visit to the final walkthrough. That is the person who answers the phone, and the person who walks the finished job with you.
The photos on this page show the crew on real Korvex jobs: framing decks, setting fence posts, compacting stone and laying slabs.
Before you say yes, you have
- A free site visit
We walk the property with you and check the slope, the soil and what sits under the surface.
- The price in writing
A written scope and price, line by line, with a start date.
- Reviews to read first
18 reviews on Google, HomeStars and Facebook, quoted word for word. Google shows 5.0 from 6. Read the reviews
- Jobs you can look at
19 Korvex jobs, photographed on site. Many show the base and the drainage before they were covered. See the projects
The first step is a free site visit. You decide once the price is in writing.
Why the base comes first
What an Ottawa spring shows
Most outdoor problems in Ottawa show up in spring: a patio that heaved, a fence that leans, steps that rock. Almost always the cause is underneath: a thin base, soil that holds water, a yard that slopes toward the house.
That part is also the easiest to skip, because nobody sees it once the job is done. So we photograph it. Many projects on this site show the base, the fabric and the drainage before they were covered.
- Finished surfacePavers, slabs, stone or sod on top.Set on the bedding
- Bedding layerScreeded flat so every unit sits evenly.Screeded flat
- Compacted basePlaced in lifts and compacted, sloped so water runs away from the house.Placed in lifts
- Filter fabricKeeps the base from mixing into the soil below.Laid over the soil
- Native soilChecked, levelled and graded before anything goes on top.To firm ground
On site
The work while it is open
Frames from Korvex jobs in Ottawa, taken while the work was under way.






- Step 01First replyUsually the same day
Request an estimate
Send the form with a few photos, or call, text or WhatsApp. We usually reply the same day and book a time to see the site.
- Step 02Written estimateUsually within a couple of days
Site visit & scope
We walk the property with you, check what sits under or behind the finish, and agree on what the job includes. The written estimate usually follows within a couple of days.
- Step 03StartUsually within about a week
Written price & start date
You get the scope and the price in writing, line by line, with a start date. Work usually starts about a week after your go-ahead, season permitting.
- Step 04On siteMost jobs: one to two weeks
Build & final walkthrough
Most jobs take one to two weeks on site, depending on size, weather and permits. We keep the site tidy and walk the finished job with you before we call it done.
More about how we work
The process, the permits and the questions homeowners ask

Start with a free site visit
Tell us what you want built and send a few photos. We come out, look at what sits under the job, and give you the scope and the price in writing.