613-880-7679FRFree Estimate

Decks · Ottawa

Deck building and rebuilds in Ottawa

New cedar decks, rebuilds and stairs, built from the footings up so the deck stays level through Ottawa winters. We check what is under the boards first, then give you a written price.

  • Cedar decking
  • Joists and beams
  • Footings
  • Outdoor-rated hardware
Rebuilt cedar deck with black aluminum balusters behind a brick house in OttawaDecks · Korvex job

What goes wrong

Why decks sag, rock and rot

Decks fail from the bottom up. Ottawa frost goes deep into the ground, and a footing that sits inside the frozen layer rises and drops with it, so the deck sags or rocks. Framing that stays wet rots where nobody looks. Stairs pull away at the bottom and railings work loose.

That is why we look under the deck before we talk about boards. Footings, beams and joists are checked or built new, and the joint with the house is flashed to keep water out of the wall.

You get a deck that feels solid underfoot, with stairs and railings that stay tight year after year.

How we build it

How we build a deck that stays level

The footings and the frame under the boards decide how long a deck lasts, so they get the most attention.

  1. Footings first

    Every post lands on a footing. One that moves shows across the whole deck.

  2. House connection

    Flashing at the joint keeps water out of the house wall.

  3. Stairs

    Stringers get solid support at the bottom, so steps stay level with the deck.

  4. Airflow

    Space under and around the frame lets the wood dry after rain and snowmelt.

  1. Deck boardsLaid with gaps so rain drains through and the frame can dry out.
    Fastened to the framing
  2. Joists and beamsSpaced for the board type and fastened with hardware rated for outdoor use.
    Checked level
  3. FootingsSet to resist frost movement, so the frame stays put from one year to the next.
    Bearing on firm ground
  4. Ground under the deckCleared and graded so water drains out from under the frame.
    Levelled across the area
  5. Native soilChecked at each footing location before anything is built on it.
    To firm ground
Typical deck build-up · every site is assessed first

What we build

Decks: the work we take on

  • Wood landing deck at the edge of a lake with a floating dock beyond it

    New decks

    Ground-level and raised decks built from the footings up, sized for how you use the yard.

  • New cedar deck boards being laid over a deck frame with joist tape

    Deck rebuilds

    New boards, framing or footings for an existing deck, depending on what is still sound.

  • Resurfaced deck with long grey boards running away from the house

    Composite decking

    Ask about composite boards if you want less staining and sealing.

  • New cedar deck stairs with black aluminum balusters at a patio door

    Stairs and landings

    Stairs framed and supported at the bottom, so they stay square to the deck.

  • Glass railings

    Ask about glass railings where you want an open view from the deck.

Wood landing deck at the edge of a lake with a floating dock beyond itWaterfront landing deck and dock
New cedar deck boards being laid over a deck frame with joist tapeCedar boards going down over the taped frame
Resurfaced deck with long grey boards running away from the houseDeck resurfaced over a repaired frame
New cedar deck stairs with black aluminum balusters at a patio doorNew cedar stairs and balusters

Real projects

Decks we have built

Our own jobs, photographed on site by the Korvex crew.

After: Cedar deck and stairs rebuilt
Before: Cedar deck and stairs rebuilt
BeforeAfter
Before / After

Cedar deck and stairs rebuilt

A weathered deck stripped to its frame and rebuilt in cedar, with new stairs and black aluminum balusters.

View project

Reviews

What homeowners say about our deck work

Quoted as written on HomeStars. All reviews

  • HomeStars · Jun 2026★★★★★
    “Work completed within 24hours of request. Very quick. Friendly. Deck looks great.”

    Carl Lanthier · Deck clean & seal · Orleans

    The job in this review: Weathered deck cleaned and sealed

Service areas

Decks across the Ottawa area

Soil, lot grading rules and house age change from one part of Ottawa to the next. Here is what that means for this work in each area.

On request: Gloucester, Carp, Richmond, Russell, Embrun. To check your street, call or text 613-880-7679.

Parliament Hill above the Ottawa River on a summer eveningParliament Hill, Ottawa
The Canadian Tire Centre seen from Highway 417 in summerCanadian Tire Centre, Kanata
The stone Goulbourn Museum building with a picket fence and autumn leavesGoulbourn Museum, Stittsville
Strandherd Drive in Barrhaven with the arches of the Vimy Memorial Bridge aheadStrandherd Drive, Barrhaven
The fountain and pond in front of Ben Franklin Place in NepeanBen Franklin Place, Nepean
A sand beach on the Ottawa River at Petrie IslandPetrie Island, Orleans
Watson's Mill, the stone grist mill on Dickinson Street in ManotickWatson's Mill, Manotick
The glass stair tower of Limebank O-Train station in Riverside SouthLimebank Station, Riverside South
  • Ottawa
    Downspouts on tight lots

    Downspouts should discharge onto grass at least four feet from the foundation, and never onto a neighbour's yard or the sidewalk. On a narrow lot that leaves little room, so the downspout is planned together with the patio or deck.

  • Kanata
    Clay next to rock

    At one site near Terry Fox Drive, silty clay ran from about 1 m to 19 m deep, with rock at the surface nearby. Post and footing depth is decided yard by yard.

  • Stittsville
    Shallow bedrock

    About 37% of the Poole Creek catchment is mapped as bedrock at the surface. Post holes and footings can meet rock at shallow depth.

  • Barrhaven
    First streets and new phases

    The first subdivision houses along Larkin Drive date to the late 1960s and early 1970s, while Half Moon Bay is one of the newer areas. Older yards come with existing structures to remove, newer ones with a recent grading plan to follow.

  • Nepean
    Post-war lots

    Qualicum-Graham Park was built in the 1960s on large lots, and Trend-Arlington was developed from the 1960s to the 1980s. Wider yards leave room for bigger decks and patios with a proper slope away from the house.

  • Orleans
    Firmer ground near the edges

    Around the edges of Orleans and in a few central spots the ground is firmer, in places a thin layer of soil over bedrock. Two yards a few streets apart can need different footing plans.

    Weathered deck cleaned and sealed

  • Manotick
    Wells and septic beds

    When a project affects a septic system, the City directs owners to the Rideau Valley Conservation Authority to check setbacks from the tank and bed. Decks, patios and footings are laid out with that in mind.

  • Riverside South
    Marine clay soils

    The community plan calls for tree planting standards suited to marine clay soils. Clay under a new yard holds water, so base depth and compaction are planned for it.

FAQ

What homeowners ask about decks

Can you replace just the boards on my deck?

Yes, when the framing and footings are sound. Korvex checks the joists, beams, footings and the connection to the house before quoting new boards, because fresh decking on a soft frame fails early and hides the problem. Where the frame is rotted through, rebuilding that part is the lasting fix, and the quote says so plainly.

Cedar or composite: which should I choose?

Cedar is natural wood and needs staining or sealing every few years to hold its colour. Composite boards need less upkeep and usually cost more up front. Both sit on a wood frame and footings, with joist spacing set for the board you choose. We walk you through the options we offer at the estimate.

Do I need a permit for a deck in Ottawa?

In Ottawa, a deck attached to or next to the house needs a building permit once its walking surface is more than 600 mm (24 in.) above grade, and so does a raised deck that gives the main access to the house. A freestanding deck needs one when it is over 10 m² and more than 600 mm high. Korvex talks through what applies to your deck at the estimate.

How long does a deck build take?

Most Korvex deck jobs take one to two weeks on site. Size, height, stairs, railings and material lead times set your schedule, and where a building permit is needed, it has to be in hand before construction starts. The schedule comes with the written quote, and weather can move individual days.

How much does a new deck cost?

A deck price depends on size, height above grade, the boards, railings and stairs, and whether an old deck has to come off first. Korvex Developments measures the site in Ottawa or the suburbs, looks at the ground where the footings will go and asks how you want to use the space, then gives you a written price.

Rebuilt cedar deck with black aluminum balusters behind a brick house in Ottawa

Book a free deck estimate

Tell us what you want built and send a few photos. We come out, look at what sits under the job, and give you the scope and the price in writing.

Feedback on this site

Something to fix or change? Point at it on the page, or write it below. The page address is attached for you.

Or describe the problem in words

Editor sign-in